Rendering
Kitasoo Xai’xais Nation Fire Hall
Kitasoo Xai’xais Nation
Emergency services · Proposed
Fire halls
Unison Architecture designs fire halls and emergency response centres with First Nations and small communities in British Columbia. We prepare the feasibility study, design the building to the BC Building Code’s post-disaster requirements, and see it through tender and construction, including projects funded through Indigenous Services Canada (ISC).
First Nations and their fire departments, volunteer or paid, planning a new fire hall or replacing one that no longer fits the apparatus or the crew.
Small communities that want a hall combined with other uses: training rooms, an emergency operations room, or an adult learning centre in the same building.
We are based in Vancouver and our projects are across British Columbia: on Haida Gwaii and the Central Coast, in the Fraser Canyon and the Interior, and in the North, including communities reached only by ferry, float plane or a long gravel road.
We provide services in Canada, except Quebec, and the USA. Our architectural licence is for British Columbia (BC) only. For projects in other regions, we partner with local architects and builders to deliver the project.
What we deliver
01
With your fire chief and the funder’s capital staff, we size the hall: number of bays, apparatus, crew and training needs. Where ISC is funding the project, the hall is measured against ISC’s Level of Service Standards for fire protection.
02
The BC Building Code treats a fire hall as a post-disaster building, designed for higher earthquake, wind and snow loads so it can stay in use when it is needed most. Structure, envelope and back-up power are planned for that from the start.
03
Bays sized to your apparatus, turnout gear storage kept apart from offices and training rooms, a place to clean gear and equipment, and exhaust capture at the vehicles.
04
Durable, low-maintenance finishes and systems that can be serviced locally, with construction logistics planned around how materials and trades reach the site.
05
We help you get competitive bids or engage a construction manager, and help draft the contract for you and the contractor to review and approve. Once construction starts, we administer the contract through to completion.
06
We help with operation and maintenance manuals, close-out procedures and the warranty walkthrough.
Projects
3 projects: 1 complete, 2 proposed.

Rendering
Kitasoo Xai’xais Nation
Emergency services · Proposed

Emergency services, Education · Complete

Rendering
Ts’kw’aylaxw First Nation · Marble Canyon, BC
Emergency services · Proposed
Questions
On reserve, fire halls are usually funded by Indigenous Services Canada through the fire protection component of its Capital Facilities and Maintenance Program. Funding is approved stage by stage, feasibility, design and then construction, and each stage needs its own submission. ISC also sets Level of Service Standards for fire protection that the project is measured against.
The BC Building Code requires buildings that have to keep operating after a disaster, fire halls among them, to be designed for higher earthquake, wind and snow loads. It affects the structure, the envelope and back-up power, so it is set at the start of design rather than added later.
Yes. One of the projects below pairs an emergency response bay with an adult learning centre. Sharing a building can save on site, servicing and running costs, but each use’s funding and code requirements have to be planned from the start.
Consultation
Tell us about the community, the site and what the building needs to do. We will come back to you about how a consultation could work.