Skip to content
Unison Architecture

Housing

Housing designed to cost less to run and to last.

Unison Architecture designs housing in British Columbia with First Nations, non-profit housing societies and private clients: Elders’ and family housing on reserve, affordable rental buildings, and energy-efficient houses. We have designed housing funded through BC Housing and CMHC, and we take projects from feasibility study to post-construction.

Who it’s for

First Nations housing departments planning Elders’ units, family homes or a multi-unit rental building, on or off reserve.

Non-profit housing societies building subsidised and affordable rental homes, and private clients building a house, a laneway home or a cabin.

Where we work

We are based in Vancouver and our projects are across British Columbia: on Haida Gwaii and the Central Coast, in the Fraser Canyon and the Interior, and in the North, including communities reached only by ferry, float plane or a long gravel road.

We provide services in Canada, except Quebec, and the USA. Our architectural licence is for British Columbia (BC) only. For projects in other regions, we partner with local architects and builders to deliver the project.

What we deliver

From feasibility study to post-construction.

  1. 01

    Feasibility and funding applications

    Unit mix, site and servicing options, and a cost estimate in the form your funder asks for, whether that is ISC, CMHC, BC Housing or a lender.

  2. 02

    Accessible and Elders’ housing

    Homes planned for ageing in place: step-free entries, wider doors and turning space, in-suite laundry, and outdoor space close to the door.

  3. 03

    Energy performance

    Air-tight envelopes, well-placed glazing and right-sized heating and cooling, designed to the BC Energy Step Code, Passive House or net-zero targets where the project calls for it.

  4. 04

    Prefabrication where it helps

    Wall panels or modules built off site where that saves time on a remote site or keeps the structure dry during construction.

  5. 05

    Design through construction

    Full design, tender and contract administration, with durable materials and details that keep maintenance low.

  6. 06

    Post-construction

    We help with operation and maintenance manuals, close-out procedures and the warranty walkthrough.

Projects

Housing projects.

6 projects: 3 complete, 1 in progress, 2 proposed.

Questions

Common questions.

How is on-reserve housing funded?

Usually from more than one source: Indigenous Services Canada’s On-Reserve Housing Program and, in BC, its Housing Support Program; CMHC’s On-Reserve Non-Profit Housing Program (Section 95) for rental housing; and BC Housing’s Indigenous Housing Fund, which funds homes both on and off reserve. Each has its own application and design requirements.

How the funding stages work

Why does energy performance matter for community housing?

Because the Nation or the tenants pay the running costs for the life of the building. An air-tight, well-insulated home costs less to heat, is more comfortable, and is less prone to the condensation and mould that shorten a house’s life.

Do you design houses for private clients?

Yes. Alongside community housing we design houses, laneway homes and cabins, mostly in and around Vancouver.

Consultation

Planning housing?

Tell us about the community, the site and what the building needs to do. We will come back to you about how a consultation could work.